冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時(shí)也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時(shí)應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時(shí),為防止壓壞底盤(pán),施工人員應(yīng)踏在底盤(pán)的加強(qiáng)筋上,在安裝塔外殼、底盤(pán)等纖維件時(shí),為防止外殼底盤(pán)等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤(pán)不變形,附近干凈、干燥的條件下,為避免使用時(shí)漏水可在接觸處鋪設(shè)纖維氈及涂樹(shù)脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場(chǎng)合,須安裝在通風(fēng)良好的場(chǎng)所。否則將會(huì)降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤(pán)向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時(shí),應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
日av免费在线观看| 天天澡天天操| 成人超碰在线一区二区| 日韩人妻精品一二区| 久久国产乱子伦精品免费在线观看| 欧美综合国产| 超碰成人欧美久久| 国产 麻豆 一区| 欧美视频play| 五月婷婷激情综合亚洲| 久久亚洲欧美视频在线| 黄色免费看的不卡| 新巴尔虎左旗| 日韩欧美一区二区影院| 国产成人91在线播放| 欧美综合视频一区二区三区| 精品一二区中文字幕| 网上美女夜夜噜噜噜爽爽爽| 欧美成人嘿嘿在线观看| 巨黄的网站久久久久久久久久久久| 人妻3p一区二区三区裸体图片| 国产精品一区亚洲二区日本三区| 国产成人亚洲精品在线看| 国产成人网站免费看| 欧美微拍福利高清| 国产人妖一区二区三区四区| 98久久久98久久久8久久| 大鸡吧插逼网站| 天天射天天干另类| 男同一区二区精品| 亚洲欧美日韩中文tv| 一区人妻教師| 淑女高潮视频网站| 中文字幕码人妻无码久久| 美女AV免费在线| 日本不卡三区四区视频| 大香蕉avav| 噜噜噜噜久久噜噜噜噜| 久操性图片| 加勒比成人综合网| 午夜蜜桃视频二区|