精品国产乱码久久久久久108,日本一区最新不卡,亚洲区二区,偷拍自超碰

歡迎進入山東恒能環(huán)保能源設備有限公司

熱線電話

0531-69953988

分類導航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設備有限公司

聯(lián)系電話:18678860671

服務熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿易試驗區(qū)濟南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

生物脫硫系統(tǒng)操作規(guī)程要注意什么!

一:系統(tǒng)運行前檢查

1: System pre-operation inspection
1:檢查沼氣流經(jīng)系統(tǒng)的各閥門控制情況,開和關要到位。
1: Check the control of each valve of the biogas flow through the system, and ensure that the opening and closing are in place.
2:檢查循環(huán)水管路上的閥門正確使用情況。
2: Check the correct use of valves on the circulating water pipe.
3:檢查各儀表,儀器是否完好,有無漏氣、漏水存在,能否正常運行。
3: Check whether all instruments are in good condition, whether there is air or water leakage, and whether they can operate normally.
4:檢查每個用水點水位,系統(tǒng)嚴禁缺水運行。
4: Check the water level of each water point, and the system is strictly prohibited from running without water.
二:運行中注意事項
2: Precautions during operation
1:設備啟動前在控制柜觸屏上要確定與之相對應的設備按鍵。
沼氣脫硫
1: Before the equipment is started, the corresponding equipment keys shall be determined on the touch screen of the control cabinet.
2;循環(huán)水泵開啟后,應觀察水泵是否上水,壓力表正常穩(wěn)定。
2; After the circulating water pump is started, observe whether the water pump is filled with water and whether the pressure gauge is normal and stable.
3:各設備啟動后,注意機器聲音、電流、振動情況、溫度、螺絲是否松動。
3: After the equipment is started, pay attention to the sound, current, vibration, temperature and looseness of screws.
4:每天按時用手持式檢測儀測生物脫硫后H2S三--四次。
4: Use hand-held detector to measure H2S after biological desulfurization three to four times every day.
5:營養(yǎng)鹽計量泵,氫氧化鈉潛污泵24小時應有正常工作水位,兩桶加水時不要讓液體溢出桶外。
5: The nutrient salt metering pump and the sodium hydroxide submersible sewage pump should have the normal working water level within 24 hours. Do not allow the liquid to overflow when adding water to two buckets.
6:曝氣池水溫控制在32℃-35℃,堿法脫硫PH值控制在8-8.5之間,氧化還原電位在-320—-260mv之間。
6: The water temperature of the aeration tank is controlled at 32 ℃ - 35 ℃, the PH value of alkali desulfurization is controlled between 8-8.5, and the redox potential is controlled between - 320 - 260mv.
三:維護保養(yǎng)
3: Maintenance
1:每天將系統(tǒng)內冷凝水排水閥放空。
1: Vent the condensate drain valve in the system every day.
2:嚴格執(zhí)行交接班制度,并做好設備安全運行記錄、各項指標參數(shù)記錄。
2: Strictly implement the shift handover system, and make records of the safe operation of the equipment and various indicators and parameters.
3:定期對設備除塵,潤滑,防銹(一個月一次),保持環(huán)境干潔。
3: Regularly dust, lubricate and rust the equipment (once a month) to keep the environment dry and clean.
4:每天往洗氣水箱注水15分鐘,達到臟水置換作用,一個月整體換一次水。
4: Fill the gas washing tank with water for 15 minutes every day to replace dirty water, and change the water once a month.
本文由沼氣脫硫提供技術支持,更多的詳細精彩內容請點擊我們的網(wǎng)站 http://aycqc.cn我們將會全心全意為您提供滿意的服務。
This article is supported by biogas desulfurization technology. For more details, please click our website http://aycqc.cn We will wholeheartedly provide you with satisfactory service.

相關產(chǎn)品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
极品久久少妇| 国产乱子伦| 五月天精品人人操人妻| 日本久久99亚洲| 天天操天天干天天射天天日| 日韩内射中出人妻| 操逼视频鸡脖| 91人妻久久澡| 五月AV网| 性色生活精品视频| 精品夜夜嗨| 字幕中文一区二区三区| 国产亚洲色婷婷九九精品| 成人大鸡吧网站| 97爱视频| 91久久亚洲综合精品日本| 大香蕉日幼稚| 香蕉一级黄| 590女教师一区二区香椎| 丁香五月亚洲美女| 久久成人网18秘 网站| 勾引大鸡巴男人大骚逼| 成人午夜视频免费播放不卡| 国产精品久久A久久| 狠狠肏屄免费视频| 伊人大香蕉九月婷婷狠狠色| 91久久久69| 欧美24K黄片| 中文字幕人妻系列人妻无码视频| 日韩综合第一区| 观看av在线| 日韩 欧美 精品 中文 一区| 中国美女网站一区二区| caoproen超碰在线| 日韩精品色av| 天天澡日日久av| 大鸡巴免费在线观看视频| 欧美一区二欧三区| 少妇美女视频网| 性色也AV| 熟女伦理视频|