沼氣發(fā)酵是人工生產(chǎn)沼氣的一個重要因素。沼氣微生物數(shù)量眾多,可以獲得各種微生物的基本生長條件,因此沼氣發(fā)酵原料可以在微生物的作用下轉化為沼氣。大型沼氣項目的啟動和調(diào)試的過程是指在沼氣池厭氧活性污泥接種和原材料,通過馴化和文化,逐漸增加的數(shù)量和活動在沼氣池厭氧活性污泥,直到沼氣池滿足需求的操作過程。
Biogas fermentation is an important factor in the production of biogas. There are a large number of biogas microorganisms, which can obtain the basic growth conditions of various microorganisms. Therefore, biogas fermentation raw materials can be transformed into biogas under the action of microorganisms. The start-up and commissioning process of large-scale biogas project refers to the operation process of inoculation and raw materials of anaerobic activated sludge in biogas digester, through domestication and culture, gradually increasing the number and activity of anaerobic activated sludge in biogas digester until the biogas digester meets the demand.
大型沼氣工程
Large scale biogas project
大型沼氣項目竣工驗收后進行啟動調(diào)試,滿足以下基本運行管理要求:
After the completion acceptance of large biogas project, start-up and commissioning shall be carried out to meet the following basic operation management requirements:
1. 操作管理人員必須熟悉大型沼氣工程的工藝流程、操作要求和設施設備的技術指標;
1. The operation and management personnel must be familiar with the process flow, operation requirements and technical indicators of facilities and equipment of large-scale biogas project;
2. 操作人員必須熟悉現(xiàn)場設施設備的操作要求和技術指標,了解沼氣工程流程;
2. Operators must be familiar with the operation requirements and technical indicators of on-site facilities and equipment, and understand the biogas engineering process;
3.操作人員應按時、準確填寫《操作記錄》,操作管理人員應定期核對原始記錄;
3. The operator shall fill in the operation record on time and accurately, and the operation manager shall check the original record regularly;
4. 操作管理人員和操作人員應當按照工藝規(guī)程和管理規(guī)定,檢查結構、設備、電器、儀表的運行情況。
4. The operation management personnel and operators shall check the operation of structures, equipment, electrical appliances and instruments in accordance with the technological procedures and management regulations.
大型沼氣項目管理要點:
Key points of large biogas project management:
1. 根據(jù)工藝設計參數(shù)進行進料量和進料周期,并在實踐中找出優(yōu)良的工藝參數(shù);
1. According to the process design parameters, feed quantity and feed cycle are carried out, and excellent process parameters are found out in practice;
2. 保持一個相對穩(wěn)定的厭氧消化溫度;
2. Maintain a relatively stable anaerobic digestion temperature;
3.厭氧消化池的攪拌按工藝要求進行。如果沼氣用于攪拌,則在啟動或產(chǎn)氣不足時,應與機械攪拌或泵攪拌等其他方法相結合。
3. The mixing of anaerobic digestion tank shall be carried out according to the process requirements. If biogas is used for mixing, it shall be combined with other methods such as mechanical mixing or pump mixing when starting or gas production is insufficient.
4. 厭氧消化池的混合不得與排泥同時進行;
4. Mixing of anaerobic digestion tank shall not be carried out at the same time with sludge discharge;
5. 建議每日監(jiān)測:pH值、揮發(fā)酸、總堿度、溫度、氣壓、產(chǎn)氣量、沼氣組成等,掌握厭氧消化池的運行情況,并根據(jù)監(jiān)測數(shù)據(jù)及時調(diào)整大型沼氣項目的運行方案或采取相應措施。
5. It is recommended to monitor daily: pH value, volatile acid, total alkalinity, temperature, air pressure, gas production, biogas composition, etc., master the operation of anaerobic digester, and adjust the operation scheme of large biogas project or take corresponding measures according to the monitoring data.